Monday 23 April 2012

Sting production


Week 3: At this point of the production we have agreed that we'll split the work load and animate every other scene, this meant that Tabi would animate the scene after the sweeping silhouette and I would take the next scene after her. This meant that I was going to do a close up of the janitor looking up then down then being shocked. I have received a lot of advices from Tabi for that scene, so then I was able to animate the next assigned scene, which was rubbing hands together. I had few problems with the volume of the moving arms but soon I have dealt with it.

No comments:

Post a Comment